Sellwood Bridge to Reopen Friday Night
Friday, November 21, 2014
The bridge will reopen before midnight.
Planning for the redesign of the Sellwood bridge began in 2006 and constrcution began in December of 2011. Slayden Construction Group and Sundt Construction were chosen to build the new bridge.
The new Sellwood Bridge is being designed to withstand an earthquake and bridge engineers have considered all the potential seismic conditions in the region and at the bridge's sepcific site, according to sellwoodbridge.org.
Follow us on Pinterest Google + Facebook Twitter See It Read It